After servicing, the integrity of the explosion-proof construction must be restored: flameproof surfaces cleaned and coated with anti-rust grease, all bolts tightened, seals intact, cable glands tightened, and the enclosure reliably earthed. Servicing must not damage the flameproof gap, otherwise the explosion-proof performance is lost.
For explosion-proof products such as ASCO LPKF (Ex d), WBLP (Ex e mb) and 2WSNF (flameproof + surge), explosion-proof compliance should be confirmed by qualified personnel after servicing.


