During reassembly, follow the reverse order of disassembly, pay attention to the installation direction and position of the spool, spring and seals, and tighten threads to the specified torque (over-tightening will damage the seal or valve body); after reassembly, perform an operation test and leak check. Explosion-proof valves must have their explosion-proof structural integrity restored.
The threaded bonnet of the ASCO 220 is removable for quick servicing; during reassembly, ensure the floating PTFE diaphragm is correctly seated.


