Check the new model's explosion protection marking, power supply method, operating voltage, polarity, number of channels, input/output form and Co/Lo item by item, and confirm that it covers the original loop requirements. When changing from a Zener barrier to an isolated barrier, the power supply and intrinsically safe earthing method must also be reconsidered.
After replacement, perform a loop test and update the loop documentation and explosion protection register to ensure traceability.


