Confirm that the model, number of channels, voltage rating and current-carrying capacity match the original loop; in particular, intrinsically safe loops must retain unchanged intrinsic safety certification parameters. After replacement, check that the grounding connection and status indication are normal.
SPDs are consumable items; it is recommended to establish a replacement cycle and inspection regime, and to check after a lightning strike whether replacement is needed.


