Check four items: first, correct wiring polarity and shield earthing; second, continuous earthing with acceptable resistance; third, normal status indication (no degradation alarm); fourth, normal signals in the protected circuit, with no attenuation or false alarms. Circuits with a bus should have communication quality verified.
After the commissioning check passes, record and file the results as the baseline for subsequent inspections.


