Perform two-point calibration with at least two standard buffer solutions (e.g. pH 4.01 and 6.86 or 9.18): clean the electrode → immerse in the first buffer → calibrate zero/slope once stable → clean → calibrate slope in the second buffer. The calibration interval depends on the required measurement accuracy and the degree of medium contamination, generally from a few days to a few weeks.
The HDM-135A on this site simplifies the calibration procedure and automatically judges whether the electrode characteristics are acceptable; the HBM-100D/160D feature CALMEMO calibration memory.


