Common Misconceptions and Accident Lessons in Intrinsic Safety

Standards & Certification · 23 November 2026

The errors recurring across the preceding sections are collected here as a “reverse checklist”.

Eight high-frequency misconceptions

  1. “Fitting a safety barrier means it is explosion-proof”— The field device itself must be certified, and its parameters must match.
  2. “Intrinsically safe devices can be wired any way”— They must pass through an associated apparatus, and must not share a cable with non-intrinsically safe circuits.
  3. “Isolation barriers need no earthing”— Energy limitation does not depend on earthing, but protective earthing and shield earthing are still required.
  4. “ia and ib are much the same”— The difference of one fault count directly determines whether Zone 0 use is permitted.
  5. “A longer cable does not matter”— Capacitance grows linearly with length and is often the bottleneck.
  6. “Swapping in an instrument of the same specification is fine”—Ci/Li may differ and must be recalculated.
  7. "An explosion protection certificate is a functional safety certificate"—Two separate standards systems; they cannot substitute for each other.
  8. "We've always done it this way and nothing has happened"—Failures in intrinsically safe systems are often latent, until the conditions align.

Three lessons from accidents

  • Failure is gradual: loose earth wires, damp insulation, replaced safety barriers—these changes do not manifest immediately and only become fatal under specific conditions. This is where the value of periodic inspection lies.
  • The evidence chain matters more than the equipment itself: with the same equipment, having calculation records, acceptance documentation and maintenance logs versus having nothing at all leads to completely different liability determinations after an accident.
  • Compliance is the baseline, not the goal: meeting standard requirements is only the starting point; true safety comes from understanding the principles—knowing why it must be done this way is what enables correct judgement in special circumstances not covered by the standards.

Scope of this series:The above 50 items are a review of fundamental concepts, intended to establish a judgement framework and not to replace design calculations and compliance reviews for specific projects. In actual engineering, area classification, system calculations and acceptance inspections should all be carried out by personnel with the appropriate qualifications and competence, with complete records retained.

← Back to Knowledge Sharing

Online customer service
Online customer service Scan or click to contact directly
Contacts
Miss Chen(Safety barriers, isolators, surge protectors)
Ms Chen Personal WeChat QR Code

Scan WeChat QR code to add personal WeChat

QQ:2501529964

Phone:17717626508

Email:chenjing@qishan-sh.com

Miss Lu(Field Instruments, Valve Accessories, Terminal Blocks)
Ms Lu Personal WeChat QR Code

Scan WeChat QR code to add personal WeChat

QQ:1695457483

Phone:13636420802

Email:lhm@qishan-sh.com

Mr. Ye(Technical Support, After-Sales Service)

QQ:97010638

Phone:15800474322

Email:web@qishan-sh.com

Online Message

Please fill in the name

Please fill in a valid contact phone number (7-20 digits)

Please enter a valid email address

Please enter the requirement description (at least 10 characters)