Four common pitfalls: first, using an isolator as a safety barrier and ignoring intrinsic safety requirements; second, looking only at signal type and ignoring load capacity and supply capability; third, using an ordinary isolator in HART applications, causing communication interruption; fourth, ignoring the power supply method, leaving no available power on site.
The way to avoid these is to confirm each item using the five-item checklist and to perform prototype testing on critical loops.


